Netwise London East (NLE)
Netwise London East (NLE) is an operational data center operated by Netwise Hosting in Canning Town, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Netwise Hosting |
| Networks | 4 networks PeeringDB. |
| Also known as | Netwise London East |
| Address | Unit 6 Datapoint Business Centre, South Crescent |
| Coordinates | 51.52056, -0.00121 |
| Website | netwise.co.uk/data-centres/london-east |
Power and grid
| Nearest high-voltage substation | West Ham Substation, 400 kV, 200 m away (National Grid;UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 53 |
| Power plants within 50 km | 3.1 GW in 98 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Netwise London East (NLE) to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Ham Substation (400 kV), about 200 m away.
How clean is the power for Netwise London East (NLE)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Netwise London East (NLE)?
Netwise Hosting.
Data centers near Canning Town
- IP House Data Centre 636 m · 3.6 MW
- Telehouse North 948 m · 31 MW
- Global Switch London East 1.1 km · 38 MW
- Global Switch London North 1.2 km
- Telehouse - London (Docklands South) 1.5 km · 37 MW
- Virtual Internet UK 1.8 km · 1.4 MW
- Cable & Wireless Data Centre 2.1 km · 1.3 MW
- EXA Datacenter London (Citi) 2.2 km
More Netwise Hosting data centers