Virtual Internet UK is an operational data center in London, United Kingdom. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,203 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Butchers Road, E16 1PW, London |
| Coordinates | 51.51665, 0.02335 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 1.3 km away (UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 1.6 km away |
| HV substations within 10 km | 44 |
| Power plants within 50 km | 7.0 GW in 100 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Virtual Internet UK use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is Virtual Internet UK to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.3 km away.
How clean is the power for Virtual Internet UK?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near London
- IP House Data Centre 1.5 km · 3.6 MW
- Ada Infrastructure (Docklands) 1.6 km
- Netwise London East (NLE) 1.8 km
- Telehouse North 1.8 km · 31 MW
- Global Switch London East 2.0 km · 38 MW
- Telehouse - London (Docklands South) 2.1 km · 37 MW
- Global Switch London North 2.4 km
- Six Degrees Data Centre 2.6 km · 3.4 MW
Sources
Correct this page or get the data