StrongMind
StrongMind is an operational data center in Chandler, United States. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,612 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.34261, -111.84096 |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does StrongMind use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How clean is the power for StrongMind?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near Chandler
- US Signal AZ01 - Phoenix 1.9 km
- GoDaddy - Gilbert 2.2 km · 8.6 MW
- All About Serving Process Server 3.8 km
- Emailage 4.4 km
- Digital Realty Data Center 5.4 km · 12 MW
- Google Mesa 8.1 km · 237 MW
- H5 Data Centers Phoenix 8.4 km · 6.8 MW
- Digital Realty PHX15 (2121 S Price Rd) 8.7 km · 32 MW
Sources
Correct this page or get the data