Data Center Directory

GoDaddy - Gilbert

GoDaddy - Gilbert is an operational data center in Gilbert, United States. Our footprint estimate of its power is about 8.6 MW.

Key facts

StatusOperational
Facility power8.6 MW (range 4.3 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,134 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest Obispo Avenue 2299, 85233, Gilbert
Coordinates33.36193, -111.83929

Satellite view

Questions

How much power does GoDaddy - Gilbert use?

We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.

Data centers near Gilbert

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.