Data Center Directory

Centersquare Phoenix (PHX3)

Centersquare Phoenix (PHX3) is an operational data center operated by Centersquare in Mesa, United States. Our footprint estimate of its power is about 7.6 MW.

Key facts

StatusOperational
OperatorCentersquare
Facility power7.6 MW (range 3.8 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,301 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks
PeeringDB.
Also known asCentersquare: Phoenix - (PHX1 - Mesa)
Address1301 West University Drive
Coordinates33.42122, -111.85898
Websitecentersquaredc.com/data-centers/phoenix

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 4.8 km away (Arizona Public Service)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
UtilityCity Of Mesa (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityWALC
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 3.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.2 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature48.6 °C (2001 to 2025)
Cooling degree days2,283 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.8 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centersquare Phoenix (PHX3) use?

We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.

How close is Centersquare Phoenix (PHX3) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 4.8 km away. The local utility is City Of Mesa, in the WALC balancing area.

How clean is the power for Centersquare Phoenix (PHX3)?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.

Who operates Centersquare Phoenix (PHX3)?

Centersquare.

Data centers near Mesa

More Centersquare data centers

Sources

Correct this page or get the data