Google Mesa
Google Mesa is an operational AI data center operated by Google in Mesa, United States. Its power is about 237 MW. Epoch AI estimates about 290,000 H100-equivalent AI chips (TPU v6e, TPU v5p).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 237 MW Reported (Epoch AI or owner data) |
| IT power | 183 MW |
| AI compute | 290,000 H100-equivalents |
| AI chips | TPU v6e, TPU v5p Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 100,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 6.9 billion Epoch AI estimate, 2025 USD. |
| Coordinates | 33.41510, -111.83146 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-08-01 | 0 | 0 | Land clearing begins for the entire site. |
| 2025-07-01 | 126 MW | 110,000 | Building 1 is operational. This is based on the state of construction on 2025-03-02 as seen on [Google Earth](https://earth.google.com/web/@33.35450568,-111.67805903,407.02398359a,2119.1496037d,35y,-0h,0t,0r/data=ChYqEAgBEgoyMDI1LTAzLTAyGAFCAggBQgIIAEoNCP___________wEQAA), where building shell and external components seems to have been completed, but there is still a lot of construction equipment present. That equipment appears to have been cleared up by this date, 4 months later, with the 2025-09-07 satellite imagery providing an upper bound. Construction has begun on the Building 2 roof, with work beginning on the areas for cooling and generators as well. |
| 2025-09-07 | 126 MW | 110,000 | Building 2 roof is mostly completed. Building 2's backup generators are almost complete, and cooling is a little more than halfway complete. The Building 2 substation is also under construction. |
| 2026-05-15 | 126 MW | 110,000 | Building 2 is close to being operational. There is only construction left on the backup generators, which are almost complete. Some equipment is also strewn around the building, especially near the air-cooled chillers. Preparation seems to have begun for Building 3 at the site. |
| 2026-08-15 | 237 MW | 290,000 | Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-07-01 | TPU v6e | 109,631 | Estimate |
| 2025-07-01 | TPU v5p | 18,447 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Mesa use?
Public data puts the facility power at about 237 MW. Reported (Epoch AI or owner data).
What chips does Google Mesa use?
Reported chips: TPU v6e, TPU v5p.
Who operates Google Mesa?
Google.
Data centers near Mesa
- Centersquare: Phoenix - (PHX1 - Mesa) 2.6 km · 7.6 MW
- GoDaddy - Gilbert 6.0 km · 8.6 MW
- StrongMind 8.1 km · 1.9 MW
- OptimumHQ 8.3 km
- Digital Realty Data Center 10.1 km · 12 MW
- Alliance Technology 10.3 km
- All About Serving Process Server 10.8 km
- Omnis Network 11.5 km · 1.7 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data