EdgeConneX Phoenix (EDCPHX01)
EdgeConneX Phoenix (EDCPHX01) is an operational data center operated by EdgeConneX in Tempe, United States. Our footprint estimate of its power is about 8.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Facility power | 8.2 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,854 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 43 networks, 3 internet exchanges PeeringDB. |
| Also known as | EdgeConneX |
| Address | 3011 S. 52nd St |
| Coordinates | 33.39554, -111.97012 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Kyrene Substation, 500 kV, 5.5 km away (Salt River Project) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.3 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeConneX Phoenix (EDCPHX01) use?
We estimate the facility power at about 8.2 MW. Estimate from building footprint, low confidence.
How close is EdgeConneX Phoenix (EDCPHX01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Kyrene Substation (500 kV), about 5.5 km away. The local utility is City Of Mesa, in the WALC balancing area.
How clean is the power for EdgeConneX Phoenix (EDCPHX01)?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates EdgeConneX Phoenix (EDCPHX01)?
EdgeConneX.
Data centers near Tempe
- Alembic Computer Services, Inc. 1.3 km
- Omnis Network Phoenix 1.6 km · 1.7 MW
- J-Curve Technologies 2.0 km
- 1GServers Data Center PHX1 2.8 km · 1.5 MW
- PhoenixNAP 4.3 km · 14 MW
- Iron Mountain Data Center - Phoenix (AZP-2) 6.3 km · 4 MW
- DataBank Phoenix (PHX2) 6.6 km
- Iron Mountain Data Center - Phoenix (AZP-1) 6.6 km · 21 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.