Iron Mountain Data Center - Phoenix (AZP-1)
Iron Mountain Data Center - Phoenix (AZP-1) is an operational data center operated by Iron Mountain in Phoenix, United States. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Facility power | 21 MW (range 8.5 MW to 53 MW) Estimate from building footprint, low confidence. Footprint estimate: about 177,508 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 33 networks, 3 internet exchanges PeeringDB. |
| Also known as | Centersquare Phoenix (PHX1) · Iron Mountain · Iron Mountain AZP-1 |
| Address | 615 N. 48th Street |
| Coordinates | 33.45441, -111.97643 |
| Website | ironmountain.com/digital-transformation/data-centers/locations/phoenix-data-center |
Power and grid
| Nearest high-voltage substation | Papago Buttes Substation, 230 kV, 4.6 km away (Salt River Project) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.6 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain Data Center - Phoenix (AZP-1) use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is Iron Mountain Data Center - Phoenix (AZP-1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Papago Buttes Substation (230 kV), about 4.6 km away. The local utility is City Of Mesa, in the WALC balancing area.
How clean is the power for Iron Mountain Data Center - Phoenix (AZP-1)?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates Iron Mountain Data Center - Phoenix (AZP-1)?
Iron Mountain.
Data centers near Phoenix
- DataBank Phoenix (PHX2) 66 m
- Iron Mountain Data Center - Phoenix (AZP-2) 272 m · 4 MW
- QTS Phoenix (PHX2) 2.0 km
- QTS 2.1 km · 18 MW
- Stack Infrastructure PHX02 Campus 2.1 km · 27 MW
- QTS 2.3 km · 18 MW
- QTS Phoenix 2 Campus 2.3 km · 50 MW
- J-Curve Technologies 4.6 km
More Iron Mountain data centers
- Iron Mountain Data Center - New Jersey (NJE-1) United States
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.