QTS is an operational data center operated by Quality Technology Services in Phoenix, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,613 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.46088, -111.99716 |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 2.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How clean is the power for QTS?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates QTS?
Quality Technology Services.
Data centers near Phoenix
- QTS Phoenix (PHX2) 208 m
- QTS Phoenix 2 Campus 301 m · 50 MW
- QTS 424 m · 18 MW
- Stack Infrastructure PHX02 Campus 517 m · 27 MW
- Iron Mountain Data Center - Phoenix (AZP-1) 2.1 km · 21 MW
- Iron Mountain Data Center - Phoenix (AZP-2) 2.1 km · 4 MW
- DataBank Phoenix (PHX2) 2.1 km
- PhoenixNAP 5.1 km · 14 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.