QTS Phoenix 2 Campus
QTS Phoenix 2 Campus is an operational data center in Phoenix, United States. Our footprint estimate of its power is about 50 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 50 MW (range 20 MW to 126 MW) Estimate from building footprint, low confidence. Footprint estimate: about 418,720 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 21,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.46260, -111.99965 |
| Website | q.com/data-centers/phoenix-2 |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Phoenix 2 Campus use?
We estimate the facility power at about 50 MW. Estimate from building footprint, low confidence.
How clean is the power for QTS Phoenix 2 Campus?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near Phoenix
- QTS 301 m · 18 MW
- QTS 302 m · 18 MW
- QTS Phoenix (PHX2) 359 m
- Stack Infrastructure PHX02 Campus 687 m · 27 MW
- Iron Mountain Data Center - Phoenix (AZP-1) 2.3 km · 21 MW
- Iron Mountain Data Center - Phoenix (AZP-2) 2.4 km · 4 MW
- DataBank Phoenix (PHX2) 2.4 km
- PhoenixNAP 5.3 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.