QTS Phoenix (PHX2)
QTS Phoenix (PHX2) is an operational data center operated by QTS Realty Trust in Phoenix, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Networks | 1 networks PeeringDB. |
| Address | 1200 N. 40th Street |
| Coordinates | 33.46237, -111.99579 |
| Website | qtsdatacenters.com |
Power and grid
| Utility | City Of Mesa (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WALC |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 2.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 48.6 °C (2001 to 2025) |
| Cooling degree days | 2,283 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.8 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for QTS Phoenix (PHX2)?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Who operates QTS Phoenix (PHX2)?
QTS Realty Trust.
Data centers near Phoenix
- QTS 208 m · 18 MW
- QTS 305 m · 18 MW
- QTS Phoenix 2 Campus 359 m · 50 MW
- Stack Infrastructure PHX02 Campus 716 m · 27 MW
- Iron Mountain Data Center - Phoenix (AZP-1) 2.0 km · 21 MW
- DataBank Phoenix (PHX2) 2.1 km
- Iron Mountain Data Center - Phoenix (AZP-2) 2.1 km · 4 MW
- PhoenixNAP 5.3 km · 14 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Atlanta-Suwanee (SUW1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Atlanta-Fayetteville (ATL2) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.