Equinix DC1-DC15,DC21-DC22 - Ashburn
Equinix DC1-DC15,DC21-DC22 - Ashburn is an operational data center operated by Equinix in Ashburn, United States. Its power is about 8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 8 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 6 MW |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 529 networks, 9 internet exchanges PeeringDB. |
| Also known as | mindSHIFT Ashburn · RC Solutions · Equinix DC2 · Equinix DC11 · Equinix DC6 · Equinix DC1 |
| Address | 21715 Filigree Ct, Building F |
| Coordinates | 39.01636, -77.45902 |
| Website | equinix.com |
Power and grid
| Nearest high-voltage substation | Nimbus Substation, 230 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 51 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix DC1-DC15,DC21-DC22 - Ashburn use?
Public data puts the facility power at about 8 MW. Derived from a tagged IT power value.
How close is Equinix DC1-DC15,DC21-DC22 - Ashburn to the power grid?
The nearest high-voltage substation in OpenStreetMap is Nimbus Substation (230 kV), about 600 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Equinix DC1-DC15,DC21-DC22 - Ashburn?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Equinix DC1-DC15,DC21-DC22 - Ashburn?
Equinix.
Data centers near Ashburn
- Equinix DC4 253 m · 8 MW
- Cologix ASH1 328 m · 156 MW
- Digital Realty IAD (44480 Hastings) 340 m · 47 MW
- Digital Realty IAD (44490 Chilum) 509 m · 18 MW
- Digital Realty IAD (44521 Hastings) 553 m · 44 MW
- Digital Realty IAD (21625 Gresham) 589 m · 44 MW
- Amazon IAD-169 608 m · 18 MW
- Equinix DC21 639 m · 60 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.