Equinix DC4
Equinix DC4 is an operational data center operated by Equinix in Ashburn, United States. Its power is about 8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 8 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 6 MW |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix DC5 |
| Address | Filigree Court 21691, 20147, Ashburn |
| Coordinates | 39.01644, -77.46195 |
| Website | equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc4 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix DC4 use?
Public data puts the facility power at about 8 MW. Derived from a tagged IT power value.
How clean is the power for Equinix DC4?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Equinix DC4?
Equinix.
Data centers near Ashburn
- Digital Realty IAD (44480 Hastings) 159 m · 47 MW
- Equinix DC1-DC15,DC21-DC22 - Ashburn 253 m · 8 MW
- Digital Realty IAD (21625 Gresham) 343 m · 44 MW
- Digital Realty IAD (44521 Hastings) 424 m · 44 MW
- Digital Realty IAD (21745 Sir Timothy) 447 m · 38 MW
- Cologix ASH1 472 m · 156 MW
- Digital Realty IAD (44490 Chilum) 529 m · 18 MW
- CloudHQ Ashburn Campus 613 m · 187 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.