Equinix DC21
Equinix DC21 is an operational data center operated by Equinix in Ashburn, United States. Our footprint estimate of its power is about 60 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 60 MW (range 30 MW to 96 MW) Estimate from building footprint, low confidence. Footprint estimate: about 16,734 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix DC22 |
| Address | Beaumeade Circle 22175, 20147, Ashburn |
| Opened | 2020 |
| Coordinates | 39.01181, -77.45451 |
| Website | equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc21 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 500 m away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 53 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix DC21 use?
We estimate the facility power at about 60 MW. Estimate from building footprint, low confidence.
How close is Equinix DC21 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 500 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Equinix DC21?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Equinix DC21?
Equinix.
Data centers near Ashburn
- H5 Data Centers Ashburn 319 m · 55 MW
- Digital Realty IAD41 464 m · 91 MW
- Amazon IAD-169 590 m · 18 MW
- Equinix DC1-DC15,DC21-DC22 - Ashburn 639 m · 8 MW
- CloudHQ Ashburn Campus 654 m · 187 MW
- Digital Realty IAD42 808 m · 62 MW
- Equinix DC4 824 m · 8 MW
- Cologix ASH1 861 m · 156 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.