Meta Mesa Data Center

Meta Mesa Data Center is an operational data center operated by Meta in Queen Creek, United States. Our footprint estimate of its power is about 161 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power161 MW (range 65 MW to 403 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,343,819 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 69,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.34293, -111.62923

Power and grid

Nearest high-voltage substationPrickly Pear Substation, 230 kV, 400 m away (Salt River Project)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
UtilitySalt River Project (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authoritySRP
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 11.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.4 GW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature19.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.5 °C (2001 to 2025)
Cooling degree days1,663 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.8 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta Mesa Data Center use?

We estimate the facility power at about 161 MW. Estimate from building footprint, low confidence.

What chips does Meta Mesa Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is Meta Mesa Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Prickly Pear Substation (230 kV), about 400 m away. The local utility is Salt River Project, in the SRP balancing area.

How clean is the power for Meta Mesa Data Center?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.

Who operates Meta Mesa Data Center?

Meta.

Data centers near Queen Creek

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.