Data center in Apache Junction
Data center in Apache Junction is an operational data center in Apache Junction, United States. Our footprint estimate of its power is about 77 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 77 MW (range 38 MW to 123 MW) Estimate from building footprint, low confidence. Footprint estimate: about 63,881 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 33,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.34720, -111.63246 |
Power and grid
| Utility | Salt River Project (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SRP |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 10.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Apache Junction use?
We estimate the facility power at about 77 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Apache Junction?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near Apache Junction
- Data center in Apache Junction 343 m · 77 MW
- Meta Mesa Data Center 562 m · 161 MW
- Data center in Apache Junction 619 m · 41 MW
- EdgeCore Digital 969 m · 19 MW
- Comarch 1.1 km
- EdgeCore Phoenix 1.2 km · 10 MW
- EdgeConneX PHX02 Data Center 1.5 km · 56 MW
- NTT PH1 Datacenter 2.0 km · 33 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.