NTT London 1
NTT London 1 is an operational data center operated by NTT Global Data Centers in Dagenham, United Kingdom. Our footprint estimate of its power is about 23 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 23 MW (range 12 MW to 37 MW) Estimate from building footprint, low confidence. Footprint estimate: about 19,377 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.54737, 0.17580 |
| Website | services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/emea/london-1-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Barking Substation, 400 kV, 5.2 km away |
| HV substations within 10 km | 13 |
| Power plants within 50 km | 7.4 GW in 113 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT London 1 use?
We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.
How close is NTT London 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 200 m away.
How clean is the power for NTT London 1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates NTT London 1?
NTT Global Data Centers.
Data centers near Dagenham
- OVH data center in Belvedere 6.2 km · 3.3 MW
- Fujitsu Data Centre 9.8 km · 22 MW
- Virtual Internet UK 11.1 km · 1.4 MW
- ABStation 11.5 km
- Six Degrees Data Centre 11.7 km · 3.4 MW
- Custodian CDC Dartford DA2 11.9 km · 4.2 MW
- Ada Infrastructure (Docklands) 12.0 km
- TATA Communications Stratford 12.0 km
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT RagingWire DC - Hillsboro United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.