Custodian CDC Dartford DA2
Custodian CDC Dartford DA2 is an operational data center operated by CustodianDC in Dartford, United Kingdom. Our footprint estimate of its power is about 4.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CustodianDC |
| Facility power | 4.2 MW (range 2.1 MW to 6.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,486 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | CustodianDC DA2 |
| Address | CUSTODIAN D C, Newtons Court |
| Coordinates | 51.45333, 0.25785 |
| Website | CustodianDC.com/dartford-london |
Power and grid
| Nearest high-voltage substation | Littlebrook/W Thurrock Cable Compound, 400 kV, 1 km away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 19 |
| Power plants within 50 km | 7.7 GW in 109 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.7 °C (2001 to 2025) |
| Cooling degree days | 38 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Custodian CDC Dartford DA2 use?
We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.
How close is Custodian CDC Dartford DA2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Littlebrook/W Thurrock Cable Compound (400 kV), about 1 km away.
How clean is the power for Custodian CDC Dartford DA2?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Custodian CDC Dartford DA2?
CustodianDC.
Data centers near Dartford
- Fujitsu Data Centre 3.2 km · 22 MW
- OVH data center in Belvedere 7.6 km · 3.3 MW
- NTT London 1 11.9 km · 23 MW
- ABStation 16.0 km
- Six Degrees Data Centre 16.3 km · 3.4 MW
- Ada Infrastructure (Docklands) 17.5 km
- Virtual Internet UK 17.7 km · 1.4 MW
- Citibank Riverdale Data Centre 18.8 km · 17 MW
More CustodianDC data centers
- Custodian CDC Maidstone 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.