Data Center Directory

Custodian CDC Dartford DA2

Custodian CDC Dartford DA2 is an operational data center operated by CustodianDC in Dartford, United Kingdom. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
OperatorCustodianDC
Facility power4.2 MW (range 2.1 MW to 6.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,486 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asCustodianDC DA2
AddressCUSTODIAN D C, Newtons Court
Coordinates51.45333, 0.25785
WebsiteCustodianDC.com/dartford-london

Power and grid

Nearest high-voltage substationLittlebrook/W Thurrock Cable Compound, 400 kV, 1 km away (National Grid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km19
Power plants within 50 km7.7 GW in 109 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.7 °C (2001 to 2025)
Cooling degree days38 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Custodian CDC Dartford DA2 use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

How close is Custodian CDC Dartford DA2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Littlebrook/W Thurrock Cable Compound (400 kV), about 1 km away.

How clean is the power for Custodian CDC Dartford DA2?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Custodian CDC Dartford DA2?

CustodianDC.

Data centers near Dartford

More CustodianDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.