Data Center Directory

OVH data center in Belvedere

OVH data center in Belvedere is an operational data center operated by OVH in Belvedere, United Kingdom. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
OperatorOVH
Facility power3.3 MW (range 1.6 MW to 5.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,742 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.49151, 0.16672

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 1.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCrayford Sealing End Compound, 275 kV, 4.9 km away
HV substations within 10 km20
Power plants within 50 km7.2 GW in 107 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does OVH data center in Belvedere use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How close is OVH data center in Belvedere to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.7 km away.

How clean is the power for OVH data center in Belvedere?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates OVH data center in Belvedere?

OVH.

Data centers near Belvedere

More OVH data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.