OVHcloud LIM1-3 Rechenzentrum is an operational data center operated by OVH in Limburg an der Lahn, Germany. Our footprint estimate of its power is about 6.3 MW.

Key facts

StatusOperational
OperatorOVH
Facility power6.3 MW (range 3.2 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,277 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLimburger Straße 45, 65555, Limburg an der Lahn
Coordinates50.40885, 8.06245

Power and grid

Nearest high-voltage substationStation Limburg, 380 kV, 400 m away (Amprion;Süwag)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km14
Power plants within 50 km1.5 GW in 34 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.1 °C (2001 to 2025)
Cooling degree days114 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does OVHcloud LIM1-3 Rechenzentrum use?

We estimate the facility power at about 6.3 MW. Estimate from building footprint, low confidence.

How close is OVHcloud LIM1-3 Rechenzentrum to the power grid?

The nearest high-voltage substation in OpenStreetMap is Station Limburg (380 kV), about 400 m away.

How clean is the power for OVHcloud LIM1-3 Rechenzentrum?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates OVHcloud LIM1-3 Rechenzentrum?

OVH.

Data centers near Limburg an der Lahn

More OVH data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.