NTT VA10
NTT VA10 is an operational data center operated by NTT Global Data Centers in Gainesville, United States. Our footprint estimate of its power is about 122 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 122 MW (range 61 MW to 195 MW) Estimate from building footprint, low confidence. Footprint estimate: about 101,725 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 52,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.80009, -77.61020 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT VA10 use?
We estimate the facility power at about 122 MW. Estimate from building footprint, low confidence.
How clean is the power for NTT VA10?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates NTT VA10?
NTT Global Data Centers.
Data centers near Gainesville
- Amazon IAD-197 900 m · 27 MW
- Gainesville Crossing Data Center Campus 2.4 km · 27 MW
- Digital Realty VA4 2.8 km · 12 MW
- AWS IAD111 2.9 km · 20 MW
- Digital Realty GNV (8217 Linton Hall) 3.0 km
- Google Mango Farm Building 3 3.1 km · 62 MW
- Google Mango Farm 3.6 km · 60 MW
- Google Mango Farm Building 1 3.6 km · 60 MW
More NTT Global Data Centers data centers
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
- NTT RagingWire DC - Hillsboro United States