Gainesville Crossing Data Center Campus
Gainesville Crossing Data Center Campus is a data center under construction operated by Corscale Data Centers in Gainesville, United States. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | Corscale Data Centers |
| Facility power | 27 MW (range 11 MW to 68 MW) Estimate from building footprint, low confidence. Footprint estimate: about 228,050 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Corscale Gainesville - Building 1 · Corscale Gainesville - Building 2 · Corscale Gainesville - Building 3 |
| Coordinates | 38.80122, -77.58218 |
Power and grid
| Nearest high-voltage substation | Youngs Branch Substation, 230 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 43 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.4 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Gainesville Crossing Data Center Campus use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How close is Gainesville Crossing Data Center Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Youngs Branch Substation (230 kV), about 400 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Gainesville Crossing Data Center Campus?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Gainesville Crossing Data Center Campus?
Corscale Data Centers.
Data centers near Gainesville
- AWS IAD111 1.3 km · 20 MW
- NTT VA10 2.4 km · 122 MW
- Google Mango Farm Building 3 2.5 km · 62 MW
- Google Mango Farm Building 1 2.8 km · 60 MW
- Digital Realty VA4 2.8 km · 12 MW
- Google Mango Farm 3.0 km · 60 MW
- Digital Realty GNV (8217 Linton Hall) 3.1 km
- Amazon Web Services data center in Bull Run 3.1 km · 9.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.