AWS IAD111

AWS IAD111 is a data center under construction operated by Amazon Web Services in Linton Hall, United States. Our footprint estimate of its power is about 20 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusUnder construction
OperatorAmazon Web Services
Facility power20 MW (range 9.8 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,397 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAWS IAD110
Coordinates38.78946, -77.57969

Power and grid

Nearest high-voltage substationAtlantic Substation, 230 kV, 600 m away (NOVEC)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km45
UtilityNorthern Virginia Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 400 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.4 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AWS IAD111 use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

What chips does AWS IAD111 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is AWS IAD111 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Atlantic Substation (230 kV), about 600 m away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.

How clean is the power for AWS IAD111?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates AWS IAD111?

Amazon Web Services.

Data centers near Linton Hall

More Amazon Web Services data centers