Amazon IAD-197
Amazon IAD-197 is an operational data center operated by Amazon Web Services in Gainesville, United States. Our footprint estimate of its power is about 27 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 27 MW (range 14 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,880 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon IAD-195 · Amazon IAD-196 · Amazon IAD-198 |
| Address | John Marshall Highway 14455, 20155, Gainesville |
| Coordinates | 38.80125, -77.62048 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon IAD-197 use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
What chips does Amazon IAD-197 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How clean is the power for Amazon IAD-197?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Amazon IAD-197?
Amazon Web Services.
Data centers near Gainesville
- NTT VA10 900 m · 122 MW
- Amazon IAD-55 2.9 km · 37 MW
- Amazon Web Services data center in Gainesville 3.2 km · 15 MW
- Gainesville Crossing Data Center Campus 3.3 km · 27 MW
- Digital Realty VA4 3.4 km · 12 MW
- Digital Realty GNV (8217 Linton Hall) 3.5 km
- AWS IAD111 3.8 km · 20 MW
- Google Mango Farm Building 3 3.8 km · 62 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.