Amazon Web Services data center in Gainesville
Amazon Web Services data center in Gainesville is an operational data center operated by Amazon Web Services in Gainesville, United States. Our footprint estimate of its power is about 15 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 15 MW (range 5.8 MW to 36 MW) Estimate from building footprint, low confidence. Footprint estimate: about 121,287 m² site outline x 0.12 kW per m² of land. |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon IAD-84 · Amazon IAD-94 · Amazon IAD-64 · AWS |
| Coordinates | 38.81597, -77.65254 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 6.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.8 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon Web Services data center in Gainesville use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
What chips does Amazon Web Services data center in Gainesville use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon Web Services data center in Gainesville to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 300 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Amazon Web Services data center in Gainesville?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Amazon Web Services data center in Gainesville?
Amazon Web Services.
Data centers near Gainesville
- Amazon IAD-55 351 m · 37 MW
- Amazon IAD-197 3.2 km · 27 MW
- NTT VA10 4.1 km · 122 MW
- Gainesville Crossing Data Center Campus 6.3 km · 27 MW
- Digital Realty VA4 6.5 km · 12 MW
- Digital Realty GNV (8217 Linton Hall) 6.6 km
- AWS IAD111 7.0 km · 20 MW
- Google Mango Farm Building 3 7.0 km · 62 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.