Meta-QTS Hillsboro 2
Meta-QTS Hillsboro 2 is an operational AI data center operated by Meta in Hillsboro, United States. Its power is about 243 MW. Epoch AI estimates about 124,000 H100-equivalent AI chips (H100).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Users | Meta (likely) |
| Facility power | 243 MW Reported (Epoch AI or owner data) |
| IT power | 180 MW |
| AI compute | 124,000 H100-equivalents |
| AI chips | H100 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 100,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 6.8 billion Epoch AI estimate, 2025 USD. |
| Energy partners | Portland General Electric, Avangrid |
| Also known as | QTS Data Center - Hillsboro 2 |
| Address | 4755 NE Huffman St, Hillsboro, OR 97124 |
| Coordinates | 45.55888, -122.92961 |
| Website | q.com/data-centers/hillsboro-2 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-04-01 | 0 | 0 | First signs of site land clearing appear on satellite imagery. |
| 2023-04-29 | 0 | 0 | Satellite imagery shows Building 3 and 4 cooling start to go on. |
| 2023-08-02 | 61 MW | 31,000 | Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of construction equipment on or immediately around the building. |
| 2024-11-08 | 243 MW | 124,000 | We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings. |
| 2025-04-14 | 243 MW | 124,000 | All four buildings are operational |
| 2026-04-17 | 243 MW | 124,000 | All four buildings are operational. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-11-08 | H100 | 123,839 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta-QTS Hillsboro 2 use?
Public data puts the facility power at about 243 MW. Reported (Epoch AI or owner data).
What chips does Meta-QTS Hillsboro 2 use?
Reported chips: H100.
Who operates Meta-QTS Hillsboro 2?
Meta. Reported users: Meta.
Data centers near Hillsboro
- QTS Data Center - Hillsboro 1 143 m · 17 MW
- QTS Data Center - Hillsboro 2 172 m · 18 MW
- QTS Hillsboro (HIL1) 268 m
- QTS Data Center - Hillsboro 2 432 m · 16 MW
- Flexential - Portland/Hillsboro 3 (PDX03) 656 m · 31 MW
- T5@Portland 762 m
- Flexential - Portland/Hillsboro 4 (PDX04) 843 m · 21 MW
- STACK Infrastructure data center in Hillsboro 927 m · 6.9 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.