A1 Next Generation Datacenter
A1 Next Generation Datacenter is an operational data center in Wien, Austria. Our footprint estimate of its power is about 4.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.8 MW (range 2.4 MW to 7.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,024 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Paukerwerkstraße 7, 1210, Wien |
| Coordinates | 48.27030, 16.43036 |
Power and grid
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 263 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.29 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does A1 Next Generation Datacenter use?
We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.
How clean is the power for A1 Next Generation Datacenter?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Data centers near Wien
- ODC21 (IBM colocation site) 201 m
- ATOS Datacenter Siemens City 592 m
- AtlasEdge DC Vienna VIE001 769 m
- AtlasEdge DC Vienna VIE002 936 m
- Digital Realty VIE1/2 - Vienna 1.5 km · 36 MW
- ÖBB Telekom Service Datacenter 2.5 km
- Florido Tower 2.8 km
- Vienna International Center 4.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.