Digital Realty VIE1/2 - Vienna is an operational data center operated by Digital Realty in Vienna, Austria. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power36 MW (range 18 MW to 57 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,830 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks192 networks, 13 internet exchanges
PeeringDB.
Also known asDigital Realty VIE1 & VIE2
AddressLouis-Haefliger-Gasse 10
Coordinates48.26903, 16.41061
Websitedigtialrealty.com

Power and grid

Nearest high-voltage substationUmspannwerk Leopoldau, 110 kV, 800 m away (Wien Energie)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Wien Nord, 380 kV, 2 km away
HV substations within 10 km31
Power plants within 50 km3.3 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity117 g CO₂ per kWh (Austria, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6%
Industrial power priceEUR 0.150 per kWh (Austria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days263 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.29 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayLow (<10%) (Austria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Digital Realty VIE1/2 - Vienna use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

How close is Digital Realty VIE1/2 - Vienna to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Leopoldau (110 kV), about 800 m away.

How clean is the power for Digital Realty VIE1/2 - Vienna?

The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.

Who operates Digital Realty VIE1/2 - Vienna?

Digital Realty.

Data centers near Vienna

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.