Adam - BCN
Adam - BCN is an operational data center operated by ADAM in Barcelona, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ADAM |
| Networks | 1 networks PeeringDB. |
| Address | Travessera de Gràcia 342 |
| Coordinates | 41.40886, 2.17007 |
| Website | adam.es |
Power and grid
| Nearest high-voltage substation | Subestació Eixample, 220 kV, 100 m away (REE;Endesa) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 32 |
| Power plants within 50 km | 2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 687 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.38 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Adam - BCN to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestació Eixample (220 kV), about 100 m away.
How clean is the power for Adam - BCN?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Adam - BCN?
ADAM.
Data centers near Barcelona
- Mare Nostrum 5 5.0 km · 6 MW
- CSUC Campus Nord 5.4 km
- Barcelona Cable Landing Station 5.5 km
- Digital Realty BCN1 - Barcelona 5.7 km
- Equinix BA1 - Barcelona 6.9 km
- Templus DC Barcelona BCN02 7.1 km
- Templus DC Barcelona BCN01 7.5 km
- MERLIN Edged BAR01 - Barcelona-PLZ 8.2 km
More ADAM data centers
- Adam - MAD Spain
- Adam - PTV Spain
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.