Mare Nostrum 5 is an operational AI data center operated by Barcelona Supercomputing Center,EuroHPC JU in Les Corts, Spain. Its power is about 6 MW. Epoch AI estimates about 4,480 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Barcelona Supercomputing Center,EuroHPC JU |
| Facility power | 6 MW Reported (Epoch AI or owner data) |
| AI compute | 4,480 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 4,480 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Barcelona Supercomputing Center Plaça d'Eusebi Güell, 1-3, Les Corts, 08034 Barcelona, Spain |
| Coordinates | 41.38981, 2.11551 |
Power and grid
| Nearest high-voltage substation | Subestació Facultats, 220 kV, 800 m away (REE;Endesa) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 31 |
| Power plants within 50 km | 2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 687 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.38 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Mare Nostrum 5 | NVIDIA H100 SXM5 80GB | 4,480 | 6 MW | 2023-11-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Mare Nostrum 5 use?
Public data puts the facility power at about 6 MW. Reported (Epoch AI or owner data).
What chips does Mare Nostrum 5 use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is Mare Nostrum 5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestació Facultats (220 kV), about 800 m away.
How clean is the power for Mare Nostrum 5?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates Mare Nostrum 5?
Barcelona Supercomputing Center,EuroHPC JU.
Data centers near Les Corts
- CSUC Campus Nord 410 m
- Equinix BA2 - Barcelona 4.5 km
- Equinix BA1 - Barcelona 4.6 km
- Templus DC Barcelona BCN01 4.7 km
- Templus DC Barcelona BCN02 4.9 km
- Adam - BCN 5.0 km
- MERLIN Edged BAR01 - Barcelona-PLZ 5.5 km
- EdgeConneX Barcelona (EDCBCN01) 10.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.