Data Center Directory

Mare Nostrum 5

Mare Nostrum 5 is an operational AI data center operated by Barcelona Supercomputing Center,EuroHPC JU in Les Corts, Spain. Its power is about 6 MW. Epoch AI estimates about 4,480 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
OperatorBarcelona Supercomputing Center,EuroHPC JU
Facility power6 MW
Reported (Epoch AI or owner data)
AI compute4,480 H100-equivalents
AI chipsNVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count4,480
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBarcelona Supercomputing Center Plaça d'Eusebi Güell, 1-3, Les Corts, 08034 Barcelona, Spain
Coordinates41.38981, 2.11551

Power and grid

Nearest high-voltage substationSubestació Facultats, 220 kV, 800 m away (REE;Endesa)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km31
Power plants within 50 km2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days687 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.38 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Mare Nostrum 5NVIDIA H100 SXM5 80GB4,4806 MW2023-11-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Mare Nostrum 5 use?

Public data puts the facility power at about 6 MW. Reported (Epoch AI or owner data).

What chips does Mare Nostrum 5 use?

Reported chips: NVIDIA H100 SXM5 80GB.

How close is Mare Nostrum 5 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestació Facultats (220 kV), about 800 m away.

How clean is the power for Mare Nostrum 5?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Mare Nostrum 5?

Barcelona Supercomputing Center,EuroHPC JU.

Data centers near Les Corts

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.