EdgeConneX Barcelona (EDCBCN01)
EdgeConneX Barcelona (EDCBCN01) is an operational data center operated by EdgeConneX in Sant Boi de Llobregat, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | Careterra Santa Creu de Calafell 99 |
| Coordinates | 41.32494, 2.03290 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Subestació de Viladecans, 400 kV, 400 m away (Red Eléctrica de España) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 16 |
| Power plants within 50 km | 2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 687 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.38 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Barcelona (EDCBCN01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestació de Viladecans (400 kV), about 400 m away.
How clean is the power for EdgeConneX Barcelona (EDCBCN01)?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates EdgeConneX Barcelona (EDCBCN01)?
EdgeConneX.
Data centers near Sant Boi de Llobregat
- Equinix BA2 - Barcelona 6.2 km
- MERLIN Edged BAR01 - Barcelona-PLZ 8.3 km
- Templus DC Barcelona BCN01 8.5 km
- Equinix BA1 - Barcelona 9.2 km
- Templus DC Barcelona BCN02 9.3 km
- CSUC Campus Nord 9.6 km
- Mare Nostrum 5 10.0 km · 6 MW
- Adam - BCN 14.8 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.