Data Center Directory

ADN Datacenters

ADN Datacenters is an operational data center operated by ADN Solutions S.A. (Rokru Int.) in Alajuela, Costa Rica. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorADN Solutions S.A. (Rokru Int.)
AddressSaret Free Zone, Buiding B8, Rio Segundo
Coordinates10.00051, -84.18475
Websiteadndatacenters.com

Power and grid

Nearest high-voltage substationSubestación Belén, 230 kV, 1.4 km away (ESPH)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Power plants within 50 km544 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity25 g CO₂ per kWh (Costa Rica, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 74.9%, wind 12%, other renewables 11.9%, solar 0.8%. Clean power: 100%

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.1 °C (2001 to 2025)
Cooling degree days915 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (Costa Rica)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is ADN Datacenters to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestación Belén (230 kV), about 1.4 km away.

How clean is the power for ADN Datacenters?

The grid in Costa Rica emits about 25 g CO₂ per kWh (2025). Largest sources: hydro 74.9%, wind 12%, other renewables 11.9%.

Who operates ADN Datacenters?

ADN Solutions S.A. (Rokru Int.).

Data centers near Alajuela

Sources

Correct this page or get the data