Data Center Directory

Microsoft

Microsoft is an operational data center operated by Microsoft in San José, Costa Rica. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
AddressAvenida 12, San José
Coordinates9.93122, -84.09882

Power and grid

Grid carbon intensity25 g CO₂ per kWh (Costa Rica, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 74.9%, wind 12%, other renewables 11.9%, solar 0.8%. Clean power: 100%

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.1 °C (2001 to 2025)
Cooling degree days915 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (Costa Rica)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

What chips does Microsoft use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How clean is the power for Microsoft?

The grid in Costa Rica emits about 25 g CO₂ per kWh (2025). Largest sources: hydro 74.9%, wind 12%, other renewables 11.9%.

Who operates Microsoft?

Microsoft.

Data centers near San José

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.