Data Center Directory

Centro de Cómputo

Centro de Cómputo is an operational data center in Patarrá, Costa Rica. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
Facility power0.7 MW (range 0.4 MW to 1.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 625 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates9.88942, -84.03674

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 2 km away (CNFL)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 5 km away
HV substations within 10 km5
Power plants within 50 km776 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity25 g CO₂ per kWh (Costa Rica, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 74.9%, wind 12%, other renewables 11.9%, solar 0.8%. Clean power: 100%

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.1 °C (2001 to 2025)
Cooling degree days915 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.29 kWh per m² per day
Wind at 50 m2.6 m/s average
Water stress todayLow (<10%) (Costa Rica)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centro de Cómputo use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

How close is Centro de Cómputo to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 2 km away.

How clean is the power for Centro de Cómputo?

The grid in Costa Rica emits about 25 g CO₂ per kWh (2025). Largest sources: hydro 74.9%, wind 12%, other renewables 11.9%.

Data centers near Patarrá

Sources

Correct this page or get the data