Data Center Directory

AGH Cyfronet Helios

AGH Cyfronet Helios is an operational AI data center operated by AGH University of Krakow in Kraków, Poland. Its power is about 0.5 MW. Epoch AI estimates about 464 H100-equivalent AI chips (NVIDIA GH200, NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
OperatorAGH University of Krakow
Facility power0.5 MW
Reported (Epoch AI or owner data)
AI compute464 H100-equivalents
AI chipsNVIDIA GH200, NVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count464
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 230 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNawojki 11, 30-950 Kraków, Poland
Coordinates50.06898, 19.90920

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15 kV „GPZ AGH”, 110 kV, 100 m away (Tauron)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110 kV „SE Wanda”, 220 kV, 12.2 km away
HV substations within 10 km22
Power plants within 50 km1.9 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.4 °C (2001 to 2025)
Cooling degree days179 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.07 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
AGH Cyfronet HeliosNVIDIA GH200 + NVIDIA H100 SXM5 80GB4640.5 MW2024-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does AGH Cyfronet Helios use?

Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).

What chips does AGH Cyfronet Helios use?

Reported chips: NVIDIA GH200, NVIDIA H100 SXM5 80GB.

How close is AGH Cyfronet Helios to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „GPZ AGH” (110 kV), about 100 m away.

How clean is the power for AGH Cyfronet Helios?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates AGH Cyfronet Helios?

AGH University of Krakow.

Data centers near Kraków

More AGH University of Krakow data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.