AGH Cyfronet Helios
AGH Cyfronet Helios is an operational AI data center operated by AGH University of Krakow in Kraków, Poland. Its power is about 0.5 MW. Epoch AI estimates about 464 H100-equivalent AI chips (NVIDIA GH200, NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | AGH University of Krakow |
| Facility power | 0.5 MW Reported (Epoch AI or owner data) |
| AI compute | 464 H100-equivalents |
| AI chips | NVIDIA GH200, NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 464 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 230 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Nawojki 11, 30-950 Kraków, Poland |
| Coordinates | 50.06898, 19.90920 |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „GPZ AGH”, 110 kV, 100 m away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110 kV „SE Wanda”, 220 kV, 12.2 km away |
| HV substations within 10 km | 22 |
| Power plants within 50 km | 1.9 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.4 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.07 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| AGH Cyfronet Helios | NVIDIA GH200 + NVIDIA H100 SXM5 80GB | 464 | 0.5 MW | 2024-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AGH Cyfronet Helios use?
Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).
What chips does AGH Cyfronet Helios use?
Reported chips: NVIDIA GH200, NVIDIA H100 SXM5 80GB.
How close is AGH Cyfronet Helios to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „GPZ AGH” (110 kV), about 100 m away.
How clean is the power for AGH Cyfronet Helios?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates AGH Cyfronet Helios?
AGH University of Krakow.
Data centers near Kraków
- S-NET KRAKOW DATA CENTER KRDC-1 591 m
- WNET DC Krakow 607 m
- Connected Krakow 664 m
- S-NET KRAKOW DATA CENTER KRDC-2 840 m
- Orange Polska // Kraków 3.4 km
- Netia Data Center SOUL 5.4 km
- AGH Cyfronet Athena 5.6 km · 0.3 MW
- Dabka Data Center 7.9 km
More AGH University of Krakow data centers
- AGH Cyfronet Athena Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.