Netia Data Center SOUL
Netia Data Center SOUL is an operational data center operated by Netia in Krakow, Poland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Netia |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Address | Frassati-Gawrońskiej 3 |
| Coordinates | 50.02120, 19.89603 |
| Website | netia.pl/en/operators/produkty/infrastructure/data-center |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „GPZ Kampus”, 110 kV, 300 m away (Tauron) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 400/220/110 kV „SE Skawina”, 400 kV, 8.2 km away |
| HV substations within 10 km | 24 |
| Power plants within 50 km | 1.9 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.4 °C (2001 to 2025) |
| Cooling degree days | 179 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.07 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Netia Data Center SOUL to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „GPZ Kampus” (110 kV), about 300 m away.
How clean is the power for Netia Data Center SOUL?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates Netia Data Center SOUL?
Netia.
Data centers near Krakow
- AGH Cyfronet Athena 700 m · 0.3 MW
- AGH Cyfronet Helios 5.4 km · 0.5 MW
- Polcom Skawina Datacenter 5.6 km · 3.5 MW
- S-NET KRAKOW DATA CENTER KRDC-1 5.7 km
- S-NET KRAKOW DATA CENTER KRDC-2 5.8 km
- Connected Krakow 6.0 km
- WNET DC Krakow 6.0 km
- Orange Polska // Kraków 7.1 km
More Netia data centers
- Netia Data Center BRAIN Poland
- Netia Data Center MIND Poland
- Netia Data Center HEART Poland
- Netia Jaworzno (JAWOH001) Poland
- Netia Poznań (POZNH003) Poland
- Netia Warsaw (WARSC001) Poland
- TKTelekom - Joanitow Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.