Netia Data Center BRAIN
Netia Data Center BRAIN is an operational data center operated by Netia in Grodzisk Mazowiecki, Poland. Our footprint estimate of its power is about 3.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Netia |
| Facility power | 3.1 MW (range 1.6 MW to 5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,597 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Address | ul. Zachodnia 4, 05-825 Grodzisk Mazowiecki |
| Coordinates | 52.11117, 20.60012 |
| Website | netia.pl/en/operators/produkty/infrastructure/data-center |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15kV "Grodzisk", 110 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna "Ołtarzew" 400/220/110kV, 400 kV, 16.1 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.1 °C (2001 to 2025) |
| Cooling degree days | 196 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Netia Data Center BRAIN use?
We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.
How close is Netia Data Center BRAIN to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15kV "Grodzisk" (110 kV), about 600 m away.
How clean is the power for Netia Data Center BRAIN?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates Netia Data Center BRAIN?
Netia.
Data centers near Grodzisk Mazowiecki
- ATMAN Data Center Warsaw-3 (WAW-3, Ożarowska 66B) 17.5 km · 7.8 MW
- OVHcloud Ożarów (WAW-1) 17.8 km · 8.9 MW
- Warsaw Data Hub 19.4 km · 14 MW
- Netia Data Center MIND 20.3 km · 0.7 MW
- Data4 Pologne WAW2 20.4 km · 1.1 MW
- Data 4 Warszawy 20.4 km · 1.4 MW
- EdgeConneX Warsaw (EDCWAW03) 22.2 km
- Equinix WA3 - Warsaw 23.6 km · 1.7 MW
More Netia data centers
- Netia Data Center MIND Poland
- Netia Data Center HEART Poland
- Netia Data Center SOUL Poland
- Netia Jaworzno (JAWOH001) Poland
- Netia Poznań (POZNH003) Poland
- Netia Warsaw (WARSC001) Poland
- TKTelekom - Joanitow Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.