Data Center Directory

Equinix WA3 - Warsaw

Equinix WA3 - Warsaw is an operational data center operated by Equinix in Warsaw, Poland. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power1.7 MW (range 0.7 MW to 4.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,147 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks32 networks, 4 internet exchanges
PeeringDB.
Also known asEquinix WA3
Address217 al. Jerozolimskie
Coordinates52.18997, 20.92074
Websiteequinix.com/locations/europe-colocation/poland-colocation/warsaw-data-centers/wa3

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15 kV „RPZ Warszawa Wiktoryn”, 110 kV, 1.5 km away (Stoen Operator)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110 kV „SE Mory”, 220 kV, 4 km away
HV substations within 10 km38
Power plants within 50 km1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.9 °C (2001 to 2025)
Cooling degree days200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix WA3 - Warsaw use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

How close is Equinix WA3 - Warsaw to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Wiktoryn” (110 kV), about 1.5 km away.

How clean is the power for Equinix WA3 - Warsaw?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates Equinix WA3 - Warsaw?

Equinix.

Data centers near Warsaw

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.