EdgeConneX Warsaw (EDCWAW03)
EdgeConneX Warsaw (EDCWAW03) is an operational data center operated by EdgeConneX in Warsaw, Poland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Address | Posag 7 Panien 1 |
| Coordinates | 52.20554, 20.88649 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Szamoty”, 110 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 220/110 kV „SE Mory”, 220 kV, 1.2 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.9 °C (2001 to 2025) |
| Cooling degree days | 200 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Warsaw (EDCWAW03) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15 kV „RPZ Warszawa Szamoty” (110 kV), about 200 m away.
How clean is the power for EdgeConneX Warsaw (EDCWAW03)?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates EdgeConneX Warsaw (EDCWAW03)?
EdgeConneX.
Data centers near Warsaw
- Data 4 Warszawy 2.5 km · 1.4 MW
- Data4 Pologne WAW2 2.6 km · 1.1 MW
- Netia Data Center MIND 2.6 km · 0.7 MW
- Equinix WA3 - Warsaw 2.9 km · 1.7 MW
- Datahouse Warsaw 2.9 km
- EdgeConneX Warsaw (EDCWAW02) 4.0 km
- OVHcloud Ożarów (WAW-1) 5.3 km · 8.9 MW
- ATMAN Data Center Warsaw-3 (WAW-3, Ożarowska 66B) 5.5 km · 7.8 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.