Data 4 Warszawy

Data 4 Warszawy is an operational data center operated by DATA4 s.a r.l in Jawczyce,, Poland. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorDATA4 s.a r.l
Facility power1.4 MW (range 0.6 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,696 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asData4 Pologne WAW1
AddressPrzyparkowa 21 - 05-850 Jawczyce
Coordinates52.21150, 20.85063
Websitedata4group.com/pl/data-centers-warsaw-poland

Power and grid

Nearest high-voltage substationPodstacja trakcyjna „Gołąbki”, 110 kV, 600 m away (PGE Energetyka Kolejowa)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110 kV „SE Mory”, 220 kV, 1.9 km away
HV substations within 10 km26
Power plants within 50 km1.4 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.9 °C (2001 to 2025)
Cooling degree days200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data 4 Warszawy use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is Data 4 Warszawy to the power grid?

The nearest high-voltage substation in OpenStreetMap is Podstacja trakcyjna „Gołąbki” (110 kV), about 600 m away.

How clean is the power for Data 4 Warszawy?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates Data 4 Warszawy?

DATA4 s.a r.l.

Data centers near Jawczyce,

More DATA4 s.a r.l data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.