Alussuo
Alussuo is a data center under construction operated by Tuike Finland in Kajaani, Finland. No power figure is public for this site yet.
Key facts
| Status | Under construction |
|---|---|
| Operator | Tuike Finland |
| Coordinates | 64.10775, 27.16186 |
Power and grid
| Grid carbon intensity | 59 g CO₂ per kWh (Finland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2% |
| Industrial power price | EUR 0.076 per kWh (Finland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Low (<10%) (Finland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Alussuo?
The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.
Who operates Alussuo?
Tuike Finland.
Data centers near Kajaani
- Kajaani Campus 29.3 km
- CSC – IT Center for Science 29.3 km
- EuroHPC LUMI 29.7 km · 12 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.