CSC – IT Center for Science

CSC – IT Center for Science is an operational data center operated by CSC in Kajaani, Finland. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCSC
Also known asLUMI (supercomputer)
Coordinates64.23164, 27.69651

Power and grid

Nearest high-voltage substationTihisenniemi sähköasema, 110 kV, 1.2 km away (Fingrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationVuolijoen sähköasema, 400 kV, 27.3 km away
HV substations within 10 km3
Power plants within 50 km40 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature29.2 °C (2001 to 2025)
Cooling degree days23 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.33 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is CSC – IT Center for Science to the power grid?

The nearest high-voltage substation in OpenStreetMap is Tihisenniemi sähköasema (110 kV), about 1.2 km away.

How clean is the power for CSC – IT Center for Science?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates CSC – IT Center for Science?

CSC.