CSC – IT Center for Science
CSC – IT Center for Science is an operational data center operated by CSC in Kajaani, Finland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CSC |
| Also known as | LUMI (supercomputer) |
| Coordinates | 64.23164, 27.69651 |
Power and grid
| Nearest high-voltage substation | Tihisenniemi sähköasema, 110 kV, 1.2 km away (Fingrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Vuolijoen sähköasema, 400 kV, 27.3 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 40 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 59 g CO₂ per kWh (Finland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2% |
| Industrial power price | EUR 0.076 per kWh (Finland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.2 °C (2001 to 2025) |
| Cooling degree days | 23 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.33 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low (<10%) (Finland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is CSC – IT Center for Science to the power grid?
The nearest high-voltage substation in OpenStreetMap is Tihisenniemi sähköasema (110 kV), about 1.2 km away.
How clean is the power for CSC – IT Center for Science?
The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.
Who operates CSC – IT Center for Science?
CSC.
Data centers near Kajaani
- Kajaani Campus 69 m
- EuroHPC LUMI 402 m · 12 MW
- Alussuo 29.3 km