APPLIWAVE - CBO
APPLIWAVE - CBO is an operational data center operated by Eurofiber France in Croissy Beaubourg, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Eurofiber France |
| Networks | 1 networks PeeringDB. |
| Address | 3 rue des vieilles vignes |
| Coordinates | 48.82287, 2.64199 |
| Website | appliwave.com |
Power and grid
| Nearest high-voltage substation | Poste électrique de Langlois, 225 kV, 2.5 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 2.1 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is APPLIWAVE - CBO to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Langlois (225 kV), about 2.5 km away.
How clean is the power for APPLIWAVE - CBO?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates APPLIWAVE - CBO?
Eurofiber France.
Data centers near Croissy Beaubourg
- BNP Paribas Marne Sud 630 m · 6 MW
- Penta Infra Paris PAR01 1.6 km · 5.1 MW
- nLighten Paris PAR1 2.0 km · 2.1 MW
- nLighten France data center in Marne La Vallée 2.1 km · 3.7 MW
- Datacenter IBM 2.4 km · 4.1 MW
- Datacenter Banque de France 2.4 km · 7.3 MW
- Datacenter IBM 3.9 km · 1.1 MW
- nLighten Paris PAR3 4.1 km · 1.5 MW