Datacenter IBM
Datacenter IBM is an operational data center operated by IBM in Bussy-Saint-Georges, France. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IBM |
| Facility power | 1.1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 899 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue Graham Bell 15 |
| Coordinates | 48.83258, 2.69293 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 2.5 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 2.1 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter IBM use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is Datacenter IBM to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 2.5 km away.
How clean is the power for Datacenter IBM?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Datacenter IBM?
IBM.
Data centers near Bussy-Saint-Georges
- Datacenter IBM 1.5 km · 4.1 MW
- Digital Realty Paris PAR12 2.4 km · 16 MW
- BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord 2.7 km · 18 MW
- Euroclear 2.7 km · 7.4 MW
- Penta Infra Paris PAR01 3.8 km · 5.1 MW
- APPLIWAVE - CBO 3.9 km
- BNP Paribas Marne Sud 4.1 km · 6 MW
- nLighten Paris PAR1 4.6 km · 2.1 MW
More IBM data centers
- IBM Auckland New Zealand
- IBM Horsham United Kingdom
- Datacenter IBM - Grabels France
- Datacenter IBM France
- Datacenter IBM France
- Datacenter IBM France
- Datacenter IBM France
- IBM Gigaplex Switzerland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.