Data Center Directory

IBM Horsham

IBM Horsham is an operational data center operated by IBM in Southwater, United Kingdom. Our footprint estimate of its power is about 9.4 MW.

Key facts

StatusOperational
OperatorIBM
Facility power9.4 MW (range 4.7 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,819 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.02156, -0.35047

Power and grid

Nearest high-voltage substationHorsham Grid Substation, 132 kV, 5.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationBolney Substation, 400 kV, 9.6 km away
HV substations within 10 km2
Power plants within 50 km884 MW in 69 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.7 °C (2001 to 2025)
Cooling degree days44 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does IBM Horsham use?

We estimate the facility power at about 9.4 MW. Estimate from building footprint, low confidence.

How close is IBM Horsham to the power grid?

The nearest high-voltage substation in OpenStreetMap is Horsham Grid Substation (132 kV), about 5.1 km away.

How clean is the power for IBM Horsham?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates IBM Horsham?

IBM.

Data centers near Southwater

More IBM data centers

Sources

Correct this page or get the data