Surrey Data Park is an operational data center in Godalming, United Kingdom. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.3 MW (range 1.7 MW to 5.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,751 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.18643, -0.60200 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Surrey Data Park use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Surrey Data Park?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Godalming
- Navisite Woking UK 15.3 km
- Digital Realty London LGW14 15.3 km · 34 MW
- Datum 16.8 km
- Datum Farnborough Data Centre 17.1 km · 13 MW
- Ark Data Centres data center in Fleet 17.2 km · 17 MW
- Asanti - Farnborough 17.6 km
- 4D Surrey 19.8 km · 1 MW
- Gravity Edge LDN1 19.9 km · 37 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.