Data Center Directory

Surrey Data Park

Surrey Data Park is an operational data center in Godalming, United Kingdom. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
Facility power3.3 MW (range 1.7 MW to 5.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,751 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.18643, -0.60200

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Surrey Data Park use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How clean is the power for Surrey Data Park?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Godalming

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.