Gravity Edge LDN1
Gravity Edge LDN1 is an operational data center operated by Gravity Edge in Camberley, United Kingdom. Our footprint estimate of its power is about 37 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Gravity Edge |
| Facility power | 37 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 31,078 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Stanhope Road, GU15 3BW, Camberley |
| Coordinates | 51.33306, -0.76683 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Gravity Edge LDN1 use?
We estimate the facility power at about 37 MW. Estimate from building footprint, low confidence.
How clean is the power for Gravity Edge LDN1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Gravity Edge LDN1?
Gravity Edge.
Data centers near Camberley
- Lincoln Rackhouse London 103 m
- Asanti - Farnborough 4.7 km
- Ark Data Centres data center in Fleet 6.1 km · 17 MW
- Datum Farnborough Data Centre 6.2 km · 13 MW
- Datum 6.2 km
- EXA Datacenter Bracknell 8.9 km · 2.9 MW
- Amazon Web Services 9.0 km · 17 MW
- CentriLogic Arlington (ARL) 9.2 km · 5 MW