EXA Datacenter Bracknell is an operational data center operated by EXA Infrastructure in Bracknell, United Kingdom. Our footprint estimate of its power is about 2.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EXA Infrastructure |
| Facility power | 2.9 MW (range 1.5 MW to 4.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,227 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | EXA Infrastructure - St James House |
| Address | St. James House |
| Coordinates | 51.41301, -0.76538 |
| Website | exainfra.net/bracknell-exa-infrastructure-colocation-data-centre |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EXA Datacenter Bracknell use?
We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.
How clean is the power for EXA Datacenter Bracknell?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates EXA Datacenter Bracknell?
EXA Infrastructure.
Data centers near Bracknell
- CentriLogic Arlington (ARL) 602 m · 5 MW
- Keppel Data Centres (Vodafone) - London 620 m · 9.9 MW
- Amazon Web Services 1.2 km · 17 MW
- Centersquare London (LHR3) 8.5 km
- CSquare London LHR3 8.9 km · 20 MW
- Gravity Edge LDN1 8.9 km · 37 MW
- Lincoln Rackhouse London 8.9 km
- Pulsant Maidenhead SE-2 10.5 km · 1 MW
More EXA Infrastructure data centers
- EXA Edge DC Frankfurt1 Germany
- EXA Infrastructure Ireland
- EXA Edge DC Marseille France
- EXA Edge DC Strasbourg France
- EXA Edge DC Bordeaux France
- EXA CLS Lynn United States
- EXA Datacenter London (Citi) United Kingdom
- EXA Edge DC Antwerp Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.