Pulsant Maidenhead SE-2
Pulsant Maidenhead SE-2 is an operational data center operated by Pulsant in Maidenhead, United Kingdom. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Pulsant |
| Facility power | 1 MW (range 0.5 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 857 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 12 networks PeeringDB. |
| Also known as | Pulsant Maidenhead |
| Address | BlueSquare House, Priors Way |
| Coordinates | 51.50035, -0.70828 |
| Website | pulsant.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 3.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 15.3 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 3.5 GW in 102 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Pulsant Maidenhead SE-2 use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is Pulsant Maidenhead SE-2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 3.4 km away.
How clean is the power for Pulsant Maidenhead SE-2?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Pulsant Maidenhead SE-2?
Pulsant.
Data centers near Maidenhead
- iomart DC5 Maidenhead 3.4 km · 2.6 MW
- Equinix LD6 - London, Slough 5.5 km · 4.6 MW
- Virgin Media O2 Slough 5.6 km · 8.4 MW
- Equinix LD4 - London, Slough 5.7 km · 11 MW
- Equinix LD7 - London, Slough 5.9 km · 15 MW
- CyrusOne London 4 5.9 km · 22 MW
- China Mobile International - London DC 5.9 km · 7.5 MW
- Equinix LD5 - London, Slough 6.0 km · 21 MW
More Pulsant data centers
- Pulsant Reading SE-3 (South) United Kingdom
- Pulsant data center in Milton Keynes United Kingdom
- Pulsant Croydon LN-1 United Kingdom
- Pulsant Edinburgh SC-2 (Medway) United Kingdom
- Pulsant Edinburgh SC-3 (Newbridge) United Kingdom
- Pulsant Edinburgh SC-1 United Kingdom
- Pulsant Reading SE-4 (East) United Kingdom
- Pulsant Birmingham WM-1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.