Data Center Directory

Pulsant Edinburgh SC-2 (Medway)

Pulsant Edinburgh SC-2 (Medway) is an operational data center operated by Pulsant in Edinburgh, United Kingdom. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
OperatorPulsant
Facility power3.3 MW (range 1.6 MW to 5.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,733 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asEdinburgh SC-2
Address7 Bankhead, Medway
Coordinates55.92569, -3.29630
Websitepulsant.com/colocation-medway-datacentre

Power and grid

Nearest high-voltage substationSighthilll Substation, 275 kV, 600 m away (SP Transmission)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km1.3 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature7.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature26.7 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.45 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow (<10%) (Scotland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Pulsant Edinburgh SC-2 (Medway) use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How close is Pulsant Edinburgh SC-2 (Medway) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Sighthilll Substation (275 kV), about 600 m away.

How clean is the power for Pulsant Edinburgh SC-2 (Medway)?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Pulsant Edinburgh SC-2 (Medway)?

Pulsant.

Data centers near Edinburgh

More Pulsant data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.